© 2017 by

ATENA srl.

Via Marzeno 65 - 48013 BRISIGHELLA - ITALY

P.Iva IT 02518570391

CODICE IDENTIFICATIVO: M5UXCR1

Tel +39 0546  060600  info@atena.srl

Per riprodurre immagini e testi è necessaria autorizzazione

Le immagini dei dispositivi sono indicative. Gli apparecchi possono subire piccole variazioni dimensionali e ponderali.

ATENA srl

65, Marzeno street 

48013 BRISIGHELLA 

ITALY

VAT number IT02518570391

Tel +039 0546 060600   info@atena.srl

Permission to reproduce images and text is required.

 

Device images are indicative. The devices can undergo small dimensional and ponderal variations.

OUR SOLVED CASES

AQUEDOTTO TOSCANO – ACQUE SPA-

6-inch tube, passing 8,600,000 liters of water per day.

Total removal of limestone and iron  43 days after Pro installation

HEATING COILS- DOMESTIC ACTIVITYHEATING 

Serpentine cleaning from the limestone after two months of Domus's work.

Recovery of about 40% of energy efficiency

RED FISH TANK- Private villa in Holland.

The disappearance of microalga after three months from the installation of Domus +.

SWIMMING POOL in  HOTEL in ISCHIA

Water Transparency with PRO Wellness 60

HOTEL HEATING SYSTEM.

Closed circuit water taken to the boiler before installation and after 5 days.

HOTEL’s  WATER SYSTEM in Rimini

Removal of existing limestone in 21 days after installing Hospitality 30

GREENGROCER  in Rome

The effect of the negative ionization of air produced by Domus leading to a greater maintenance of the fruits outside the refrigerator

PRIMA DELL'INSTALLAZIONE - Problemi di calcare incrostante

FOUNTAIN IN  CAPRERA’S  SQUARE in  Rome

Test run in 2010 for a few months.

1st Generation of Quantum Technology

 AFTER 3 MONTHS FROM INSTALLATION - No scaling

The device in the fountain water treatment room

LAS AMERICAS GOLF FIELD – Tenerife – JUNE – JULY 2017-

Test for solving the problem of microalgae developed in the ponds of the field.

June, 15 - Pro Green Sport 60 installation day

June 28 - 13 days after installing Pro Green Sport 60

July 12 - 27 days after installing Pro Green Sport 60

CONDOMINIUM In province of BERGAMO

.Cleaning from aragonite from the condenser boiler heat exchanger caused by Pro 60.

HOTEL TO SEASONAL OPENING IN MARINA LOCATIONS

Legionella presence (10,000 UFC / liter) before Hospitality Medium installation and 40 days after installation.

AGRICULTURE

                                                       INSTALLATION IN RICE PADDY

Installation of Pro Green 60

Difference at  31 july 2016

          AGRICULTURE 

                                                        INSTALLATION IN MAIS FIELD                                                          

Installation of Pro Green 60

Difference at 31 july 2017

AGRICOLTURE

INSTALLATION IN KIWI ORCHARD

esperimentation in progress from 2014 to 2017

Installation of Pro Green 60

Growing fruits in the "quantized" field

Size difference between "quantized" fruits and control fruits

Quantized fruits and controlled fruits  in cell  where experimentation takes place.

Magnetic resonance on "quantized" fruits

Difference  of conservation at 60 days from collection